Results 1 to 10 of 1928 for “ngtl limited”
NGTL is proposing to permanently cease operations at 28 meter stations and 31 lateral pipelines, loops and/or producer tie-ins on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
NGTL is proposing to permanently cease operations at seven meter stations and 37 lateral pipelines, loops and/or producer tie-ins on the NGTL
NGTL is permanently ceasing operations at 21 laterals and three meter stations on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.
Emerson Creek Compressor Station (CS) and Saddle Hills CS C4 Unit Addition leverage emerging technology to lower GHGs and reduce carbon taxes.
NGTL is safely removing service to specific energy infrastructure. Learn more about the 2021 Abandonment Program.
tce-ngtl-pipeline-trust-agreement.pdf
tce-NGTL-GP-SIPP-Effective-June-3-2024.pdf
NGTL is permanently ceasing operations at two lateral pipelines, three associated meter stations and three stand-alone laterals on the NGTL System within Alberta because these facilities are no longer necessary to provide service to customers.
NGTL is permanently ceasing operations at 16 meter stations and 16 associated lateral pipelines, four stand-alone meter stations, four producer tie-ins and nine stand-alone laterals on the NGTL System within Alberta as these facilities are no longer necessary to provide service to customers.