Results 131 to 140 of 1456 for “safety”

The recent completion of the Murray River Horizontal Directional Drill (HDD) marks a huge milestone for Coastal Gaslink – the largest trenchless water crossing on the project has been completed with zero safety incidents. This 1.3 kilometre section of pipe weighs over 1.2 million pounds, and the 48-inch HDD signifies the largest of its kind for TC Energy and one of the longest in North America. Before work could even begin on-site, years of planning went into making sure everything went smoothly in coordination with our prime contractor Surerus Murphy Joint Venture (SMJV).

On the Buckeye XPress (BXP) project in southern Ohio, four state-approved herpetologists are on speed dial with TC Energy’s construction team. Part of the pipeline is near a snake hibernaculum, or winter snake den, where species protected by the state, such as the timber rattlesnake, are known to roam. For that reason, the BXP team has put in place mitigation measures to ensure the safety of snakes—as well as its workers from the venomous reptiles.

We have shut down the Keystone Pipeline System and mobilized people and equipment in response to a confirmed release of oil into a creek in Washington County, Kan., approximately 20 miles (32 kilometres) south of Steele City, Neb.

Mcleod South Factsheet

The proposed Grande Prairie Mainline Loop No. 4 (Valhalla North Section) and Berland River Compressor Station C3 Unit Addition will increase natural gas transportation service on our existing natural gas pipeline system in Alberta to meet growing demand.